Can I Build a House in an Existing Cluster in the Countryside?

By the NI Planning Permission team · November 19, 2026

Possibly. Northern Ireland countryside policy allows a new house at an existing cluster of development where the group is well defined, has a focal point or sits at a crossroads, and the site rounds off the group without spilling into open countryside. Under Policy CTY 2a of PPS 21, every one of six criteria must be met. In practice, very few groups of houses meet all of them, so a careful look at the site is essential before you buy land or commission drawings.

This guide explains each criterion, how it tends to be applied, and how a cluster site differs from an infill or farm site. It is general information, not advice on a particular site.

Which policy applies?

PPS 21 still applies in councils without an adopted Plan Strategy. At the time of writing (November 2026), six councils have adopted one: Belfast, Fermanagh and Omagh, Lisburn and Castlereagh, Mid and East Antrim, Antrim and Newtownabbey, and Derry City and Strabane. Their cluster policies may differ in wording and detail from CTY 2a, so for sites in those districts the council’s own policy must be read. See our article on whether PPS 21 still applies.

The six CTY 2a criteria

Planning permission will be granted for a dwelling at an existing cluster of development provided all of the following are met.

1. Four or more buildings, at least three of them dwellings

The cluster must lie outside a farm and consist of four or more buildings, of which at least three are dwellings. Ancillary buildings such as garages, outbuildings and open-sided structures are not counted. A farmyard with a farmhouse and sheds will not normally count, because the policy says the cluster must lie outside a farm.

2. A visual entity in the local landscape

The group must appear as a visual entity in the local landscape. In other words, it should read as a recognisable group when seen from the surrounding roads and viewpoints, not as a loose scatter of houses spread along a road.

3. A focal point or a crossroads

The cluster must be associated with a focal point, such as a social or community building or facility, or be located at a crossroads. Examples of focal points might include a church, a school, a community hall or a shop. This criterion is often where applications struggle. A group of houses with no focal point, and not at a crossroads, will not meet the policy, however tightly grouped it is.

4. Enclosure, bounded on at least two sides

The site must provide a suitable degree of enclosure and be bounded on at least two sides by other development in the cluster. A field at the edge of the group, with development on only one side, is unlikely to qualify.

5. Rounding off and consolidation

Development of the site must be absorbed into the existing cluster through rounding off and consolidation. It must not significantly alter the cluster’s character or visually intrude into open countryside. A site that extends the group outward, rather than filling it in, is a common reason for refusal.

6. No harm to residential amenity

The new house must not adversely affect the amenity of neighbouring homes, for example through overlooking, overshadowing or the position of the access.

The usual countryside tests also apply

Even if the cluster criteria are met, the proposal must still satisfy:

  • CTY 13, integration and design, including not relying primarily on new planting to integrate;
  • CTY 14, rural character, including avoiding a suburban-style build-up of development;
  • safe access and visibility splays onto the public road, in line with Department for Infrastructure guidance; and
  • CTY 16, where the house relies on a septic tank or other non-mains sewerage.

Cluster, infill or farm: which route fits?

Many sites could appear to fit more than one policy. Picking the right route matters, because the evidence and design approach are different.

  • Cluster (CTY 2a): a defined group of four or more buildings around a focal point or crossroads, with the site enclosed on at least two sides. See below for common pitfalls.
  • Infill (CTY 8): a small gap, for up to two houses, in an otherwise substantial and continuously built-up road frontage. Read our guide to infill and gap sites.
  • Farm dwelling (CTY 10): an active and established farm business, with the new house sited beside the farm buildings. See our guide to farm dwelling eligibility.
  • Replacement (CTY 3): an existing building with the essential characteristics of a dwelling. See our replacement dwellings page.

Common pitfalls with cluster sites

  • Counting garages, sheds or farm buildings towards the four-building total.
  • Relying on a “focal point” that is not a social or community building or facility, or a junction that is not a true crossroads.
  • A site that has development on only one side.
  • A site at the edge of the group that would extend it into an open field.
  • A group that is spread out along a road and reads as a ribbon rather than a cluster.

Gathering the evidence

A good cluster application usually includes a plan showing every building in the group and its use, photographs from the surrounding roads, an explanation of the focal point, and a site layout showing how the new house rounds off the group. Planning history for the surrounding plots can also help, because recent decisions on nearby sites show how the council has read the same group.

How we can help

We look at the group on the ground, map the buildings and their uses, check the planning history, and tell you plainly whether CTY 2a, or the council’s own cluster policy, is realistically met. Where another route looks stronger, we will say so. Find out more about our rural planning service and our site appraisals, or read our guide to building a house in the countryside.

Frequently asked questions

What counts as a cluster in Northern Ireland planning?

Under CTY 2a, four or more buildings, excluding ancillary buildings such as garages and outbuildings, of which at least three are dwellings. The group must lie outside a farm, read as a visual entity and be associated with a focal point or be at a crossroads.

What is a focal point?

PPS 21 describes it as a social or community building or facility. A church, school, community hall or local shop are typical examples. Alternatively, the cluster can be located at a crossroads.

Can I build on the edge of a cluster?

Only if the site is enclosed and bounded on at least two sides by other development in the cluster, and it rounds off the group rather than extending it into open countryside.

Is a cluster site the same as an infill site?

No. Infill under CTY 8 concerns a small gap in a continuous road frontage. A cluster site under CTY 2a concerns a defined group of buildings around a focal point or crossroads.

Talk to our team

If you think your site may sit within a cluster, call us on 028 9591 6888 or send us the address and we will give you an honest view before you spend money on plans.

Get planning advice

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 9591 6888 ✉ Emailinfo@ Free adviceenquiry form