Planning Permission in Newry, Mourne & Down

Three AONBs, a long coastline and the slowest decision times in Northern Ireland. In Newry, Mourne and Down a well-prepared first application matters more than anywhere else. PPS 21 still applies while the draft Plan Strategy moves forward.

Newry, Mourne and Down at a glance

Planning authority
Newry, Mourne & Down District Council
Planning office
Planning Office, Haughey House, Unit 19 Rampart Road, Greenbank Industrial Estate, Newry BT34 2QU · 0330 137 4036 · planning@nmandd.org · council planning pages
Apply / search via
NI Planning Portal
Development plan
Draft Plan Strategy published 27 June 2025, not adopted; existing area plans + SPPS + PPSs apply
Decision times (local)
Average processing time (a median) 45.8 weeks in Apr–Jun 2026 (4.3% within 15 weeks); 45.8 weeks over 2025/26. NI target: 15 weeks. Source
Our local number
028 3045 0001 · main office 028 9591 6888

Newry, Mourne and Down is where much of our rural work happens. The register shows us as agent on ten approvals here: farm dwellings near Drumaness and Rostrevor, infill sites at Jonesborough and Mullaghbawn, an off-site replacement near Newtownhamilton, a replacement dwelling at Ballintogher near Downpatrick, a site in Ardglass, a pub-to-dwelling conversion at Silverbridge, a family annex in Jonesborough and a curtilage extension near Castlewellan. Most are in south Armagh and the Mourne and Lecale countryside, which is exactly where the policy tests bite hardest.

Which plan applies

The council has not yet adopted a Plan Strategy. It published its draft Plan Strategy on 27 June 2025; consultation closed on 22 September 2025, counter-representations ran from 30 January to 20 April 2026, and in November 2026 the council was consulting on focused changes. Until adoption, applications are assessed against:

  • the Banbridge, Newry and Mourne Area Plan 2015 (Newry, south Armagh, Mourne);
  • the Ards and Down Area Plan 2015 (the legacy Down district: Downpatrick, Newcastle, Ballynahinch, Lecale);
  • the SPPS and the Planning Policy Statements, including PPS 21 in the countryside.

Policies that matter most here

  • PPS 21 CTY 10 – Dwellings on farmsactive and established for six years, no sites sold off within 10 years, visually linked or clustered with farm buildings. Our Drumaness and Rostrevor approvals were CTY 10 cases.
  • PPS 21 CTY 8 – Ribbon development (small gap infill)Jonesborough and Mullaghbawn were infill cases. The “substantial and continuously built-up frontage” test is applied strictly.
  • PPS 21 CTY 3 – Replacement dwellingsincluding off-site replacement where justified, as at Newtownhamilton.
  • PPS 21 CTY 13 and CTY 14 – Integration and rural charactercrucial on open drumlin and mountain slopes.
  • PPS 2 Policy NH 6 – AONBsMourne, Ring of Gullion, and Strangford and Lecale.
  • PPS 7 Addendum, EXT 1house extensions and annexes.
  • PPS 6listed buildings and conservation areas, for example in Downpatrick and Newry.
  • PPS 16 – TourismNewcastle, the Mournes and the coast.

How the council handles applications

Applications are made through the NI Planning Portal and handled by the council planning team (the Newry office is now at Haughey House, Rampart Road). Decision times are the longest in Northern Ireland: an average processing time of 45.8 weeks (the official figure is a median) in April to June 2026, and 45.8 weeks across 2025/26 (DfI). In practice that means planning for close to a year from submission on many rural applications. It also means a refusal is expensive in time, which is why we put the effort into the first submission.

Landscape and constraints

  • Mourne AONB (designated 1986): the mountains behind Newcastle, the coastal plain and outliers such as Slieve Croob.
  • Ring of Gullion AONB: south Armagh around Slieve Gullion, Mullaghbawn and Forkhill.
  • Strangford and Lecale AONB: Ardglass, Killough, Strangford and the Lecale coast.
  • Coastal flooding and exposed headlands; archaeology is common in Lecale and south Armagh.

What tends to succeed

A farm dwelling sited tight to the existing yard, a genuine small-gap infill, and a replacement of a building with clear domestic character are the routes that work. Outline first, then reserved matters, is usually the sensible sequence here: it settles the principle before money is spent on full house designs.

Towns we cover

Newry, Downpatrick, Newcastle, Warrenpoint, Kilkeel, Rostrevor, Ballynahinch, Castlewellan, Crossmaglen, Bessbrook, Ardglass and the villages of south Armagh and Lecale.

Frequently asked questions

NI Planning Permission Ltd advises on planning applications in the Newry, Mourne and Down District Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).

Has Newry, Mourne and Down adopted a Plan Strategy?

Not yet. The council published its draft Plan Strategy on 27 June 2025. Consultation and a period for counter-representations have closed, and the plan process is well advanced, but the Strategy has not been adopted. Until it is, applications continue to be assessed against the existing area plans, the Strategic Planning Policy Statement and the Planning Policy Statements, including PPS 21 for development in the countryside.

How do AONBs affect a planning application here?

Parts of the district lie within three Areas of Outstanding Natural Beauty: the Mourne AONB, the Ring of Gullion AONB, and the Strangford and Lecale AONB. In an AONB, landscape character, siting, scale and design are central to whether a rural house or an extension is likely to be acceptable. An early site appraisal is often the difference between a realistic proposal and one that is unlikely to succeed.

Which number should I call?

For a site in this area, call our Newry and Downpatrick number 028 3045 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form with the site address and a short description of the proposal.

What kinds of application do you handle in this district?

We advise on countryside homes, extensions and change of use throughout the district, including Newry, Downpatrick, Newcastle, Warrenpoint, Kilkeel and Ballynahinch, and in the rural and coastal hinterland. We can appraise a site against PPS 21, the relevant area plan and any AONB or heritage designation.

Why are Newry, Mourne and Down decisions so slow?

DfI statistics show an average processing time of 45.8 weeks (the official figure is a median) for local applications decided or withdrawn in April to June 2026, the longest of the 11 councils, with about 4% decided within 15 weeks. We cannot shorten the council's queue, but a complete, policy-compliant application avoids further requests for information.

Where is the Newry planning office now?

The council's Newry planning office has moved to Haughey House, Unit 19 Rampart Road, Greenbank Industrial Estate, Newry BT34 2QU (0330 137 4036, planning@nmandd.org). Applications are made online through the NI Planning Portal.

For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.

Recent approvals we have secured in Newry, Mourne and Down

Outline · Granted

Detached dwelling (outline)

Ardglass

LA07/2024/1096/O · Decision Dec 2025

Full · Granted

Curtilage extension for a domestic shed

near Castlewellan

LA07/2024/1217/F · Decision Nov 2025

Reserved Matters · Granted

Replacement dwelling and garage (reserved matters)

Ballintogher, near Downpatrick

LA07/2024/0158/RM · Decision Sep 2025

Full · Granted

Change of use: pub/restaurant to a dwelling

Silverbridge

LA07/2024/0920/F · Decision Aug 2025

Outline · Granted

Infill dwelling (outline)

Jonesborough

LA07/2023/1325/O · Decision Aug 2025

Outline · Granted

Farm dwelling and garage (outline)

Drumaness

LA07/2023/3591/O · Decision Jun 2025

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

See our case studies →

How long decisions take in Newry, Mourne and Down

In April to June 2026 the council decided 286 local applications and approved 92% of them. The Department's average processing time (a median, from a valid application to a decision) was 45.8 weeks, against 46.1 weeks in the same quarter of 2025 and 45.8 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.

Local applications: median processing time (weeks), validation to decision or withdrawal
CouncilApr–Jun 2026Apr–Jun 20252025/26 yearWithin 15 weeks (Apr–Jun 2026)
Belfast18.813.618.137.8%
Lisburn and Castlereagh18.34829.445.6%
Antrim and Newtownabbey11.410.41363.6%
Ards and North Down1817.616.345.5%
Newry, Mourne and Down45.846.145.84.3%
Armagh, Banbridge and Craigavon21.820.221.834.9%
Mid Ulster1819.222.442.4%
Mid and East Antrim10.677.662.2%
Causeway Coast and Glens20.82318.233.5%
Derry City and Strabane17.334.525.241.8%
Fermanagh and Omagh8.47.67.669.3%

Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.

Council application fees in Newry, Mourne and Down

Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:

ApplicationCouncil fee
Householder: extension, alteration, garage, garden building, wall or fence£347 per dwelling
Outline permission: single house£515
Reserved matters: single house£515
Full permission: single house£1,035
Change of use to a dwelling£842 for the first dwelling
Other change of use£307 per 75 m² of floor space
Varying or removing a condition (section 54)£307
Advertisement consent£231
Listed building consent / conservation area consentNo fee

Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Newry, Mourne and Down

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 3045 0001 ✉ Emailinfo@ Free adviceenquiry form