NI Planning Permission Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 2521 0001 info@niplanningpermission.co.uk

Planning Permission in Mid & East Antrim

Mid and East Antrim has had its own Plan Strategy since October 2023, with countryside housing policies HOU9 to HOU16 replacing PPS 21. It is also one of Northern Ireland's fastest councils, but has the lowest approval rate.

Mid and East Antrim at a glance

Planning authority
Mid & East Antrim Borough Council
Planning office
Planning Office, Ardeevin, 80 Galgorm Road, Ballymena BT42 1AB · council planning pages
Apply / search via
NI Planning Portal
Development plan
Plan Strategy 2030 adopted 16 October 2023; Local Policies Plan under way
Decision times (local)
Average processing time (a median) 10.6 weeks in Apr–Jun 2026 (62.2% within 15 weeks); 7.6 weeks over 2025/26. NI target: 15 weeks. Source
Our local number
028 2521 0001 · main office 028 9591 6888

Mid and East Antrim joins three very different places: Ballymena and its farming hinterland in the Braid and the Main valley, the port town of Larne and the Antrim Coast and Glens, and Carrickfergus, Greenisland and Whitehead on Belfast Lough. Recent decisions with us as agent include a dwelling at Greenisland (outline in October 2024, reserved matters in February 2026), a retrospective loft conversion near Ballymena (September 2025), and a domestic store with an upper-floor sensory room on medical grounds in Larne (June 2024).

The adopted Plan Strategy 2030

Mid and East Antrim Borough Council adopted its Local Development Plan 2030 – Plan Strategy on 16 October 2023, effective the same day. Since then the Planning Policy Statements no longer apply here as operational policy. The council has started work on the Local Policies Plan, which had not been adopted when we checked in November 2026, so older area plan designations (the Ballymena Area Plan 1986–2001, the Larne Area Plan 2010 and, for Carrickfergus, the Carrickfergus Area Plan 2001 and the Belfast Urban Area Plan 2001 as they apply, with draft BMAP a material consideration only) can still be relevant to individual sites.

Policies we use most in Mid and East Antrim

  • GP1 – General Policy for all Developmentapplies to all proposals needing permission except minor proposals, under criteria a) to e) (design and local character, residential amenity, access and parking, safety and health, sustainable development). Proposals in the countryside must also meet criterion f): no significant adverse impact on landscape character, rural character or environmental quality.
  • HOU9 – Replacement dwellingsin the countryside.
  • HOU10 – Dwelling on a farm businessthe business must be active and established for the last six years, with no dwellings or development opportunities sold off within 10 years, and the house clustered with the farm buildings. Permission only once every 10 years.
  • HOU11 – Dwelling for a non-agricultural business enterprise.
  • HOU12 – New dwelling in an existing cluster; HOU13 – Ribbon/infill development (a small gap for one dwelling only, in a substantial and continuously built-up frontage).
  • HOU14 – Personal and domestic circumstances; HOU15 – Residential caravans and mobile homes (temporary permission only).
  • HOU16 – Affordable housing in the countrysidesmall groups next to villages and small settlements, for a registered housing association or NIHE to meet an identified need.
  • Built heritage policiesCarrickfergus’s historic walled town and castle setting, and conservation areas in Ballymena, Glenarm and Carnlough.
  • AONB and coastal policiesthe Antrim Coast and Glens AONB along the eastern seaboard.

Source: Mid and East Antrim Local Development Plan pages, checked 13 November 2026. Ask us for the exact wording of any policy before relying on it.

How the council handles applications

Applications go through the NI Planning Portal to the planning office at Ardeevin, 80 Galgorm Road, Ballymena BT42 1AB. Mid and East Antrim is quick: a median of 10.6 weeks in April to June 2026 and 7.6 weeks across 2025/26 (DfI). It is also firm. The approval rate for local applications that quarter was 81%, the lowest in Northern Ireland, against 94% overall. Quick refusals are the risk, so the case has to be made fully in the submission rather than through later negotiation.

Landscape and constraints

  • Antrim Coast and Glens AONB: Larne, Glenarm, Carnlough and the glens. Siting and design are central.
  • Carrickfergus: the walled town, the castle and archaeology.
  • Belfast Lough coast at Greenisland and Whitehead: coastal and amenity considerations.
  • Slemish and the Braid uplands east of Ballymena: open, exposed landscapes.

What tends to succeed

Retrospective householder works can be regularised where the design is acceptable. A retrospective application is better than waiting for enforcement. Countryside proposals need a clear policy route under HOU9 to HOU16 from the outset; general “need” arguments rarely succeed.

Towns we cover

Ballymena, Larne, Carrickfergus, Greenisland, Whitehead, Ahoghill, Cullybackey, Broughshane, Glenarm, Carnlough and Kells.

Frequently asked questions

NI Planning Permission Ltd advises on planning applications in the Mid and East Antrim Borough Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).

Has Mid and East Antrim adopted a Plan Strategy?

Yes. The council adopted its Plan Strategy on 16 October 2023. Planning applications in the borough are now assessed against that adopted Plan Strategy.

What parts of the borough do you cover?

The borough runs from Ballymena to Carrickfergus and Larne, and from the inland countryside to the Antrim coast and glens. We advise homeowners and businesses across the area, including sites where coastal or glens landscape designations affect siting and design.

Which number should I call?

For a site in this borough, call our Ballymena number 028 2521 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form with the site address and a short description of the proposal.

Which policy covers a farm dwelling in Mid and East Antrim?

Policy HOU10 of the adopted Plan Strategy 2030 (Dwelling on a Farm Business). The farm business must be currently active and have been active and established for the last six years. No dwellings or development opportunities outside settlement limits can have been sold off from the farm business within 10 years of the application date. The new house should be visually linked or sited to cluster with an established group of buildings on the farm, using an existing lane where practicable. Permission under HOU10 is only given once every 10 years. The proposal must also meet the general policy GP1, including criterion f) for development in the countryside.

Is it harder to get permission in Mid and East Antrim?

Decisions are quick (an average processing time of 10.6 weeks (the official figure is a median) in April to June 2026), but the approval rate for local applications that quarter was 81%, the lowest of the 11 councils (DfI). That makes getting the application right first time especially important.

For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.

Recent approvals we have secured in Mid and East Antrim

Reserved Matters · Granted

Dwelling and garage (reserved matters)

Greenisland

LA02/2025/0878/RM · Decision Feb 2026

Full · Granted

Retention of a loft conversion

near Ballymena

LA02/2025/0558/F · Decision Sep 2025

Outline · Granted

Dwelling and garage (outline)

Greenisland

LA02/2022/0530/O · Decision Oct 2024

Full · Granted

Domestic store with upper-floor sensory room

Larne

LA02/2024/0341/F · Decision Jun 2024

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

See our case studies →

How long decisions take in Mid and East Antrim

In April to June 2026 the council decided 193 local applications and approved 81% of them. The Department's average processing time (a median, from a valid application to a decision) was 10.6 weeks, against 7 weeks in the same quarter of 2025 and 7.6 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.

Local applications: median processing time (weeks), validation to decision or withdrawal
CouncilApr–Jun 2026Apr–Jun 20252025/26 yearWithin 15 weeks (Apr–Jun 2026)
Belfast18.813.618.137.8%
Lisburn and Castlereagh18.34829.445.6%
Antrim and Newtownabbey11.410.41363.6%
Ards and North Down1817.616.345.5%
Newry, Mourne and Down45.846.145.84.3%
Armagh, Banbridge and Craigavon21.820.221.834.9%
Mid Ulster1819.222.442.4%
Mid and East Antrim10.677.662.2%
Causeway Coast and Glens20.82318.233.5%
Derry City and Strabane17.334.525.241.8%
Fermanagh and Omagh8.47.67.669.3%

Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.

Council application fees in Mid and East Antrim

Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:

ApplicationCouncil fee
Householder: extension, alteration, garage, garden building, wall or fence£347 per dwelling
Outline permission: single house£515
Reserved matters: single house£515
Full permission: single house£1,035
Change of use to a dwelling£842 for the first dwelling
Other change of use£307 per 75 m² of floor space
Varying or removing a condition (section 54)£307
Advertisement consent£231
Listed building consent / conservation area consentNo fee

Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Mid and East Antrim

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 2521 0001 ✉ Emailinfo@ Free adviceenquiry form