NI Planning Permission Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9591 6888 info@niplanningpermission.co.uk

Planning Permission in Belfast

A Belfast-based planning consultancy working with Belfast City Council every week: extensions, change of use, an HMO, short-term lets, listed buildings and new homes, assessed under the adopted Plan Strategy 2035.

Belfast at a glance

Planning authority
Belfast City Council
Planning office
Planning Service, Cecil Ward Building, 4-10 Linenhall Street, Belfast BT2 8BP · council planning pages
Apply / search via
NI Planning Portal
Development plan
Plan Strategy 2035 adopted 2 May 2023; Local Policies Plan in preparation
Decision times (local)
Average processing time (a median) 18.8 weeks in Apr–Jun 2026 (37.8% within 15 weeks); 18.1 weeks over 2025/26. NI target: 15 weeks. Source
Our local number
028 9591 6888 · main office 028 9591 6888

Our office is in the Scottish Provident Building on Donegall Square West, a few minutes’ walk from the council’s Planning Service in the Cecil Ward Building on Linenhall Street. Belfast is the council we deal with most often. Over the last few years the public register records us as agent on house extensions in the east and west of the city, a dwelling in a side garden in Orangefield, changes of use on High Street and Shaftesbury Square, an HMO in south Belfast, and listed building and advertisement consents for a riverside venue on Donegall Quay.

Belfast’s development plan: what applies to your site

Belfast was the second council in Northern Ireland to adopt a Plan Strategy, after Fermanagh and Omagh. The Belfast Local Development Plan, Plan Strategy 2035 was adopted on 2 May 2023 and is now the main policy test for every application in the city. The Planning Policy Statements no longer apply here as operational policy.

The plan comes in two parts, and only the first is in place. Until the Local Policies Plan is adopted, zonings and site designations still come from the Belfast Urban Area Plan 2001, with draft BMAP as a material consideration. BMAP 2015 was adopted on 9 September 2014, but the Court of Appeal quashed that adoption on 18 May 2017. Around Dunmurry the Lisburn Area Plan 2001 still covers a small area, and the Lagan Valley Regional Park Local Plan 2005 applies inside the Park. Part of our first check on any Belfast site is simply working out which of these documents bites.

The Belfast policies we use most

  • RD2 – Residential extensions and alterationsthe test for rear extensions, dormers, loft conversions and garage conversions. Scale, design, overlooking and the effect on the street are what decide it.
  • HOU10 – Housing management areas (HMAs)the city’s HMO policy. Inside an HMA, HMOs plus flats may not exceed 20% of dwelling units; outside, HMOs may not exceed 10% of units on the street.
  • HOU13 – Short-term let accommodationnew-build or change of use to short-term lets must meet all six criteria: (a) strengthen and diversify the city’s short-stay visitor accommodation; (b) be accessible by public transport; (c) sit within an existing tourism cluster or close to a visitor attraction; (d) have appropriate management arrangements; (e) not be in a designated HMA unless a specific unsatisfied demand there is shown; and (f) on a change from permanent residential use, part of the property must be retained as permanent housing.
  • HOU3 – Protection of existing residential accommodationrelevant whenever a house would be lost to another use.
  • BH1, BH2, BH3 – Listed buildings, conservation areas, areas of townscape characterthese apply across much of the city centre, the Malone and Stranmillis areas and many older streets.
  • DES1 and DES4 – Urban design; advertising and signageshopfronts, signs and awnings, especially on listed buildings and in conservation areas.
  • RD3 – Conversion or sub-division of existing buildings for flats or apartmentssplitting a large house or upper floors into flats.
  • LC2 and LC3 – Lagan Valley Regional Park; Belfast Hillslandscape tests at the edge of the city, together with the countryside policies DC1 to DC13.

Source: Belfast LDP Plan Strategy 2035 (adopted May 2023), checked 13 November 2026.

How Belfast City Council handles applications

Applications are made through the NI Planning Portal. The Planning Service validates them, publishes them, notifies neighbours and consults bodies such as DfI Roads, NI Water, the Historic Environment Division and Environmental Health. Most householder and small commercial applications are decided by officers under delegated powers; larger, contentious or called-in cases go to the Planning Committee.

In practice, Belfast applications live or die on detail. City centre changes of use need a clear account of the existing lawful use. A listed building needs listed building consent as well as planning permission, and works such as an awning or new signs can need three separate consents, as on our Donegall Quay project (full permission, listed building consent and advertisement consent were all granted in June 2026). An HMO application needs the HMA count done properly before it goes in.

Common Belfast projects, and what helps

  • Extensions in terraced and semi-detached streets. Keep two-storey rear projections modest, avoid overshadowing the neighbour’s back windows, and match materials. Front dormers on a uniform terrace are hard to justify.
  • Garage conversions and garden rooms. Often permitted development, but not always; check the Planning (General Permitted Development) Order (NI) 2015 and any conditions on the original permission.
  • Shops, cafés, salons and clinics. A change between business uses may or may not need permission depending on the use classes involved. Upper floors in older buildings frequently raise listed building and fire-escape questions.
  • An HMO or short-term let. Licensing (HMO licence, tourism certification) is separate from planning permission. You usually need both.
  • New homes in side gardens. Plot size, the building line and parking decide most of these.

Towns and neighbourhoods we cover

All of the Belfast City Council area: the city centre, north, south, east and west Belfast, Dunmurry, Finaghy, Stranmillis, Malone, Castlereagh Road and the Belfast Hills edge. For neighbouring councils see Lisburn, Newtownabbey and Bangor.

Frequently asked questions

NI Planning Permission Ltd advises on planning applications in the Belfast City Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).

Who decides planning applications in Belfast?

Belfast City Council is the local planning authority. Applications are assessed against the adopted Belfast Local Development Plan, Plan Strategy 2035, which was adopted and became operative on 2 May 2023, together with the relevant area plan for zonings until the Local Policies Plan is adopted, and any other material considerations for the site.

Do I need planning permission for a house extension in Belfast?

Many extensions need permission, especially if they go beyond permitted development limits or the property is in a conservation area, an area of townscape character, or near a listed building. Permitted development is a legal test, not a rule of thumb. We can review the proposal before you commit to drawings.

Is planning permission for an HMO the same as an HMO licence?

No. Planning permission for HMO use is separate from an HMO licence. Belfast’s adopted Plan Strategy includes policy on HMOs and on concentrations of this type of housing. The earlier Houses in Multiple Occupation Subject Plan for the Belfast City Council Area 2015 also remains relevant until the Local Development Plan is fully adopted.

How do I speak to a planning consultant about a Belfast site?

Call NI Planning Permission on 028 9591 6888, email info@niplanningpermission.co.uk, or use our contact form. We are based in the Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH. Please include the site address and a short description of the proposal.

Which Belfast policy deals with house extensions?

Policy RD2 (Residential extensions and alterations) of the Belfast Plan Strategy 2035, read with the urban design principles in Policy DES1. In a conservation area or area of townscape character, policies BH2 or BH3 also apply.

How long does Belfast City Council take to decide a local application?

The Department for Infrastructure's statistics give an average processing time of 18.8 weeks (the official figure is a median) for local applications decided or withdrawn in April to June 2026, against a 15-week target. A complete, well-prepared application is the best way to avoid extra delay.

For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.

Recent approvals we have secured in Belfast

Full · Granted

Retractable awning to a listed riverside venue

Belfast city centre (Donegall Quay)

LA04/2026/0181/F · Decision Jun 2026

Advertisement · Granted

Advertisement consent for awning signage

Belfast city centre (Donegall Quay)

LA04/2026/0162/A · Decision Jun 2026

Listed Building Consent · Granted

Listed building consent for an awning

Belfast city centre (Donegall Quay)

LA04/2026/0163/LBC · Decision Jun 2026

Full · Granted

Change of use of a 4-bed house to an HMO

South Belfast

LA04/2025/1157/F · Decision Oct 2025

Full · Granted

Two-storey side/rear extension and garden room

West Belfast

LA04/2025/0014/F · Decision Apr 2025

Full · Granted

New rear driveway access

West Belfast

LA04/2023/2729/F · Decision Feb 2025

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

See our case studies →

How long decisions take in Belfast

In April to June 2026 the council decided 278 local applications and approved 95% of them. The Department's average processing time (a median, from a valid application to a decision) was 18.8 weeks, against 13.6 weeks in the same quarter of 2025 and 18.1 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.

Local applications: median processing time (weeks), validation to decision or withdrawal
CouncilApr–Jun 2026Apr–Jun 20252025/26 yearWithin 15 weeks (Apr–Jun 2026)
Belfast18.813.618.137.8%
Lisburn and Castlereagh18.34829.445.6%
Antrim and Newtownabbey11.410.41363.6%
Ards and North Down1817.616.345.5%
Newry, Mourne and Down45.846.145.84.3%
Armagh, Banbridge and Craigavon21.820.221.834.9%
Mid Ulster1819.222.442.4%
Mid and East Antrim10.677.662.2%
Causeway Coast and Glens20.82318.233.5%
Derry City and Strabane17.334.525.241.8%
Fermanagh and Omagh8.47.67.669.3%

Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.

Council application fees in Belfast

Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:

ApplicationCouncil fee
Householder: extension, alteration, garage, garden building, wall or fence£347 per dwelling
Outline permission: single house£515
Reserved matters: single house£515
Full permission: single house£1,035
Change of use to a dwelling£842 for the first dwelling
Other change of use£307 per 75 m² of floor space
Varying or removing a condition (section 54)£307
Advertisement consent£231
Listed building consent / conservation area consentNo fee

Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Belfast

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 9591 6888 ✉ Emailinfo@ Free adviceenquiry form