Mid Ulster at a glance
- Planning authority
- Mid Ulster District Council
- Planning office
- Planning Department, Dungannon Office, Circular Road, Dungannon BT71 6DT · 03000 132 132 · council planning pages
- Apply / search via
- Mid Ulster's own online planning service
- Development plan
- Draft Plan Strategy (2019) not adopted; DfI Section 15 Direction 27 August 2026; area plans + SPPS + PPSs apply
- Decision times (local)
- Average processing time (a median) 18 weeks in Apr–Jun 2026 (42.4% within 15 weeks); 22.4 weeks over 2025/26. NI target: 15 weeks. Source
- Our local number
- 028 7912 0001 · main office 028 9591 6888
Mid Ulster is farming and manufacturing country: Dungannon, Cookstown, Magherafelt, Coalisland, Maghera and a large rural area that climbs into the Sperrins and runs down to Lough Neagh. Our register summary lists 11 Mid Ulster decisions with us as agent. They include the ground-mounted solar array with battery storage at Irwin’s Mills, Dungannon (December 2024), a storage and assembly shed for a manufacturer near Clogher, farm dwellings near Draperstown and Cookstown, an infill dwelling at Draperstown, two dwellings near Dungannon (outline then reserved matters), a garage-to-annex conversion in Dungannon, a pharmacy extension in Coalisland, an artist’s studio near Coalisland and a day care expansion in Moneymore.
Which plan applies
Mid Ulster’s draft Plan Strategy was published on 22 February 2019 and submitted to DfI on 28 May 2021, but has not been adopted. On 27 August 2026 DfI issued a Section 15 Direction requiring the council to modify it, and the council’s timetable is under review. No Independent Examination has been held. Applications are therefore decided against:
- the Dungannon and South Tyrone Area Plan 2010;
- the Cookstown Area Plan 2010;
- the Magherafelt Area Plan 2015;
- the SPPS and Planning Policy Statements, with PPS 21 for the countryside.
In a December 2024 Mid Ulster decision, the officer report recorded that the draft Plan Strategy did not then carry determining weight.
Policies that decide most applications here
- PPS 21 CTY 10 – Dwellings on farmsour Draperstown and Cookstown farm dwelling approvals.
- PPS 21 CTY 8 – Infillthe Glengomna Road, Draperstown infill was approved in full.
- PPS 21 CTY 2a, CTY 3, CTY 6, CTY 13, CTY 14clusters, replacements, personal circumstances, integration and character.
- PPS 4 Policy PED 2 and PED 3 – Economic development in the countryside, including expansion of established businessesrural manufacturing, like the Clogher shed.
- Renewable energy – SPPS Edition 2since 11 December 2025 renewable proposals are assessed under the SPPS Edition 2 (pages 86–91), and PPS 18 is cancelled. Our Irwin’s Mills solar approval (December 2024) was decided under PPS 18 as it then stood.
- PPS 7 Addendum EXT 1house extensions and annexes.
- PPS 2 Policy NH 6the Sperrin AONB.
- PPS 3 Policy AMP 2access onto public roads, often critical on rural lanes.
How the council handles applications
Mid Ulster is the only council not on the shared NI Planning Portal; it uses its own online planning service. The Planning Department is at the Dungannon office, Circular Road, Dungannon BT71 6DT (03000 132 132). DfI figures (which include the Mid Ulster portal) give a median of 18.0 weeks for local applications in April to June 2026, down from 22.4 weeks across 2025/26, with an approval rate of almost 99% that quarter.
Landscape and constraints
- Sperrin AONB in the north-west of the district (the Sperrin uplands around Draperstown and west of Cookstown).
- Lough Neagh and Lough Beg: nature conservation and flood risk along the eastern edge.
- Clogher Valley and the Fermanagh border hills in the south-west.
- Busy rural roads: visibility splays and access are frequent issues.
What tends to succeed
Mid Ulster is generally receptive to rural business growth and farm dwellings that meet the policy tests. The key is evidence: farm business IDs and activity, business accounts and a clear site layout showing how the building clusters with what is already there.
Towns we cover
Dungannon, Cookstown, Magherafelt, Coalisland, Maghera, Moneymore, Draperstown, Castledawson, Aughnacloy, Clogher, Fivemiletown and Pomeroy.
Frequently asked questions
NI Planning Permission Ltd advises on planning applications in the Mid Ulster District Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).
Has Mid Ulster adopted a Plan Strategy?
No. The council published a draft Plan Strategy in 2019 and submitted it to the Department for Infrastructure in 2021, but it has not been adopted. On 27 August 2026 the Department for Infrastructure issued a section 15 Direction requiring the council to modify the draft, and no Independent Examination has been held. Until a Plan Strategy is adopted, applications are assessed against the existing area plans — the Cookstown Area Plan 2010, the Dungannon and South Tyrone Area Plan 2010 and the Magherafelt Area Plan 2015 — together with the Strategic Planning Policy Statement and the Planning Policy Statements. For a house in the countryside, PPS 21 remains the starting point. The draft may be a material consideration, but it is not the adopted plan.
Is Mid Ulster on the NI Planning Portal?
No. Mid Ulster is the only council that does not use the shared NI Planning Portal. It runs its own online planning service. Our NI Planning Portal guide links to it.
Can you name a recent project in this district?
Yes. We were the planning agent for a ground-mounted solar array and associated infrastructure, including a battery energy storage system, on land beside Stillago Mills, near Eglish, Dungannon — the Irwin’s Mills site. Mid Ulster District Council granted planning permission under reference LA09/2024/0586/F in December 2024. You can read more on our case studies page. Every site is different, and that permission does not mean a similar proposal will be approved elsewhere.
Which number should I call?
For a site in this area, call our Magherafelt and Dungannon number 028 7912 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form with the site address and a short description of the proposal.
Is Mid Ulster on the NI Planning Portal?
No. Mid Ulster District Council runs its own online planning service for submitting, searching and commenting on applications. Fees are the same as everywhere else in Northern Ireland.
What did the August 2026 Direction do?
On 27 August 2026 the Department for Infrastructure issued a Section 15 Direction requiring the council to modify its draft Plan Strategy. The council says its timetable is under review. The adopted plans therefore remain the three legacy area plans plus regional policy.
For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.
Recent approvals we have secured in Mid Ulster
Full · Permission Granted
Storage/assembly shed for a manufacturing business
near Clogher
LA09/2024/0770/F · Decision Jun 2025
Full · Permission Granted
Ground-mounted solar array with battery storage
Irwin's Mills, Dungannon
LA09/2024/0586/F · Decision Dec 2024
Full · Permission Granted
Garage extended and converted to a family annex
Dungannon
LA09/2022/0700/F · Decision Dec 2022
Full · Permission Granted
Two-storey rear extension to a pharmacy
Coalisland
LA09/2022/0170/F · Decision Apr 2022
Full · Permission Granted
Expansion of a registered childminding/day care use
Moneymore
LA09/2020/1425/F · Decision Feb 2021
Reserved Matters · Permission Granted
Two detached dwellings and garages (reserved matters)
near Dungannon
LA09/2020/0953/RM · Decision Dec 2020
Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.
How long decisions take in Mid Ulster
In April to June 2026 the council decided 273 local applications and approved 99% of them. The Department's average processing time (a median, from a valid application to a decision) was 18 weeks, against 19.2 weeks in the same quarter of 2025 and 22.4 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.
| Council | Apr–Jun 2026 | Apr–Jun 2025 | 2025/26 year | Within 15 weeks (Apr–Jun 2026) |
|---|---|---|---|---|
| Belfast | 18.8 | 13.6 | 18.1 | 37.8% |
| Lisburn and Castlereagh | 18.3 | 48 | 29.4 | 45.6% |
| Antrim and Newtownabbey | 11.4 | 10.4 | 13 | 63.6% |
| Ards and North Down | 18 | 17.6 | 16.3 | 45.5% |
| Newry, Mourne and Down | 45.8 | 46.1 | 45.8 | 4.3% |
| Armagh, Banbridge and Craigavon | 21.8 | 20.2 | 21.8 | 34.9% |
| Mid Ulster | 18 | 19.2 | 22.4 | 42.4% |
| Mid and East Antrim | 10.6 | 7 | 7.6 | 62.2% |
| Causeway Coast and Glens | 20.8 | 23 | 18.2 | 33.5% |
| Derry City and Strabane | 17.3 | 34.5 | 25.2 | 41.8% |
| Fermanagh and Omagh | 8.4 | 7.6 | 7.6 | 69.3% |
Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.
Council application fees in Mid Ulster
Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:
| Application | Council fee |
|---|---|
| Householder: extension, alteration, garage, garden building, wall or fence | £347 per dwelling |
| Outline permission: single house | £515 |
| Reserved matters: single house | £515 |
| Full permission: single house | £1,035 |
| Change of use to a dwelling | £842 for the first dwelling |
| Other change of use | £307 per 75 m² of floor space |
| Varying or removing a condition (section 54) | £307 |
| Advertisement consent | £231 |
| Listed building consent / conservation area consent | No fee |
Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator or Mid Ulster's own planning service before submitting. Our own professional fee is separate from the council fee.
How to work with us
- Call or email
Send the site address (or postcode) and a line about what you want to do.
- Free initial view
We check the plan, constraints and planning history and tell you honestly what is realistic.
- Site appraisal
Where needed, a site appraisal to confirm the policy route and the reports your application will need.
- Drawings & application
We prepare the drawings, statements and forms and submit through the Planning Portal.
- Through to decision
We deal with the case officer and consultees and keep you updated until the decision.
Planning advice in Mid Ulster
Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.