Causeway Coast and Glens at a glance
- Planning authority
- Causeway Coast & Glens Borough Council
- Planning office
- Planning Office, Cloonavin, 66 Portstewart Road, Coleraine BT52 1EY · council planning pages
- Apply / search via
- NI Planning Portal
- Development plan
- No Plan Strategy yet; Northern Area Plan 2016 + SPPS + PPSs apply; draft Plan Strategy expected autumn/winter 2026
- Decision times (local)
- Average processing time (a median) 20.8 weeks in Apr–Jun 2026 (33.5% within 15 weeks); 18.2 weeks over 2025/26. NI target: 15 weeks. Source
- Our local number
- 028 7039 0001 · main office 028 9591 6888
Causeway Coast and Glens covers Coleraine, Portrush, Portstewart, Ballymoney, Ballycastle, Limavady and Dungiven, and some of the most protected landscape in Northern Ireland. Our most recent decision here is outline permission for a farm dwelling near Dungiven (December 2025), under PPS 21 Policy CTY 10.
Which plan applies
Causeway Coast and Glens has not adopted a Plan Strategy and, as of 13 November 2026, had not yet published a draft one. The development plan is the Northern Area Plan 2016 (adopted 22 September 2015), read with the SPPS and the Planning Policy Statements, including PPS 21 in the countryside. The council’s published timetable pointed to a draft Plan Strategy for consultation in autumn or winter 2026. When it appears, it will be a material consideration with limited weight at first.
The Northern Area Plan is important here because it designates the landscape and coastal policy areas that shape what can be built where. Before anyone commits to a site, we check its designations on the plan maps.
Policies that decide most applications here
- PPS 21 CTY 1, CTY 2a, CTY 3, CTY 8, CTY 10the routes to a new rural home (principle, clusters, replacement, infill, farm dwellings).
- PPS 21 CTY 13 and CTY 14integration and rural character, which are critical in open coastal and glen landscapes.
- PPS 2 Policy NH 6 – AONBsCauseway Coast, Antrim Coast and Glens, Binevenagh and Sperrin AONBs.
- Northern Area Plan 2016 designationssettlement limits, landscape and coastal policy areas.
- PPS 6World Heritage Site setting, listed buildings and conservation areas.
- PPS 16 – Tourismholiday accommodation, visitor facilities and self-catering units.
- PPS 7 Addendum EXT 1extensions in Coleraine, Portstewart and the towns.
- SPPS town-centre policychanges of use in Coleraine, Ballymoney and the resorts.
Source: Causeway Coast and Glens planning, development plan pages checked 13 November 2026.
How the council handles applications
The Planning Office is at Cloonavin, 66 Portstewart Road, Coleraine, and applications go in through the NI Planning Portal. DfI statistics give a median of 20.8 weeks for local applications in April to June 2026 (18.2 weeks across 2025/26), with about a third decided within 15 weeks.
Landscape and constraints
- Giant’s Causeway and Causeway Coast World Heritage Site: development in its setting is scrutinised very closely.
- Causeway Coast AONB, Antrim Coast and Glens AONB (around Ballycastle and the glens), Binevenagh AONB (Magilligan and Downhill) and the Sperrin AONB (around Dungiven).
- Coastal erosion and flooding along the north coast and the River Bann and Roe.
- Second-home and holiday-let pressure in Portrush, Portstewart and Ballycastle.
What tends to succeed
Farm dwellings sited close to existing buildings, genuine small-gap infill and replacement of old dwellings with clear domestic character. In the resorts, sensible changes of use and well-designed extensions that respect the seafront scale. Speculative new houses in open coastal countryside are rarely realistic.
Towns we cover
Coleraine, Limavady, Ballymoney, Portrush, Portstewart, Ballycastle, Dungiven, Bushmills, Castlerock, Garvagh and Kilrea.
Frequently asked questions
NI Planning Permission Ltd advises on planning applications in the Causeway Coast and Glens Borough Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).
Has Causeway Coast and Glens adopted a Plan Strategy?
Not yet. A new Local Development Plan is being prepared, but when this page was last written it had not reached draft Plan Strategy stage. Applications are still assessed against the existing development plans and the regional Planning Policy Statements. Always check the current position with the council, because the plan timetable can change.
Why is this a sensitive planning area?
The borough includes a World Heritage Site, several Areas of Outstanding Natural Beauty, and strong pressure for rural houses and tourism development along the coast and in the glens. Landscape, siting and design need particular care, especially around Portrush, Portstewart, Ballycastle and the Causeway Coast.
Which number should I call?
For a site in this area, call our Coleraine and Limavady number 028 7039 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form, and include the site address and a short description of the proposal.
Can you help with a countryside house or a tourism proposal?
Yes. We advise on countryside homes, extensions and change of use throughout the borough, and we can appraise a site against the current plans, PPS 21 where it still applies, and any landscape or heritage designation before you commit to a scheme.
What is the development plan for Causeway Coast and Glens?
The Northern Area Plan 2016, adopted on 22 September 2015, together with the SPPS and the Planning Policy Statements. The council is preparing a new Local Development Plan; its timetable pointed to a draft Plan Strategy in autumn or winter 2026, but it had not been published when we checked on 13 November 2026.
Can I build a holiday home on the north coast?
New holiday homes in the open countryside are tightly controlled. Tourism proposals are assessed under PPS 16 and the Northern Area Plan, and the AONB and coastal policies add further tests. Conversions of suitable existing buildings are often the more realistic route.
For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.
Recent approvals we have secured in Causeway Coast and Glens
Outline · Granted
Farm dwelling and garage (outline)
near Dungiven
LA01/2025/1204/O · Decision Dec 2025
Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.
How long decisions take in Causeway Coast and Glens
In April to June 2026 the council decided 189 local applications and approved 93% of them. The Department's average processing time (a median, from a valid application to a decision) was 20.8 weeks, against 23 weeks in the same quarter of 2025 and 18.2 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.
| Council | Apr–Jun 2026 | Apr–Jun 2025 | 2025/26 year | Within 15 weeks (Apr–Jun 2026) |
|---|---|---|---|---|
| Belfast | 18.8 | 13.6 | 18.1 | 37.8% |
| Lisburn and Castlereagh | 18.3 | 48 | 29.4 | 45.6% |
| Antrim and Newtownabbey | 11.4 | 10.4 | 13 | 63.6% |
| Ards and North Down | 18 | 17.6 | 16.3 | 45.5% |
| Newry, Mourne and Down | 45.8 | 46.1 | 45.8 | 4.3% |
| Armagh, Banbridge and Craigavon | 21.8 | 20.2 | 21.8 | 34.9% |
| Mid Ulster | 18 | 19.2 | 22.4 | 42.4% |
| Mid and East Antrim | 10.6 | 7 | 7.6 | 62.2% |
| Causeway Coast and Glens | 20.8 | 23 | 18.2 | 33.5% |
| Derry City and Strabane | 17.3 | 34.5 | 25.2 | 41.8% |
| Fermanagh and Omagh | 8.4 | 7.6 | 7.6 | 69.3% |
Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.
Council application fees in Causeway Coast and Glens
Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:
| Application | Council fee |
|---|---|
| Householder: extension, alteration, garage, garden building, wall or fence | £347 per dwelling |
| Outline permission: single house | £515 |
| Reserved matters: single house | £515 |
| Full permission: single house | £1,035 |
| Change of use to a dwelling | £842 for the first dwelling |
| Other change of use | £307 per 75 m² of floor space |
| Varying or removing a condition (section 54) | £307 |
| Advertisement consent | £231 |
| Listed building consent / conservation area consent | No fee |
Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.
How to work with us
- Call or email
Send the site address (or postcode) and a line about what you want to do.
- Free initial view
We check the plan, constraints and planning history and tell you honestly what is realistic.
- Site appraisal
Where needed, a site appraisal to confirm the policy route and the reports your application will need.
- Drawings & application
We prepare the drawings, statements and forms and submit through the Planning Portal.
- Through to decision
We deal with the case officer and consultees and keep you updated until the decision.
Planning advice in Causeway Coast and Glens
Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.