NI Planning Permission Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9235 0001 info@niplanningpermission.co.uk

Planning Permission in Lisburn & Castlereagh

Lisburn and Castlereagh decides applications under its own adopted Plan Strategy 2032. PPS 21 no longer applies here, so countryside sites, extensions and changes of use are tested against the council's COU, HOU and other operational policies.

Lisburn and Castlereagh at a glance

Planning authority
Lisburn & Castlereagh City Council
Planning office
Planning Unit, Lagan Valley Island, The Island, Lisburn BT27 4RL · council planning pages
Apply / search via
NI Planning Portal
Development plan
Plan Strategy 2032 adopted 26 September 2023; Local Policies Plan in preparation
Decision times (local)
Average processing time (a median) 18.3 weeks in Apr–Jun 2026 (45.6% within 15 weeks); 29.4 weeks over 2025/26. NI target: 15 weeks. Source
Our local number
028 9235 0001 · main office 028 9591 6888

Lisburn and Castlereagh runs from Lisburn city and Hillsborough across to Dundonald, Carryduff and the Castlereagh hills, with a wide farmed hinterland around Moira, Dromara, Glenavy and Aghalee. It is commuter country, so we see a steady mix of extensions, garage conversions and new homes on infill sites, alongside commercial changes of use in business parks and town centres. Recent decisions with us as agent include a dwelling on the Castlereagh hills off Manns Road (reserved matters, April 2025), an outline consent near Lisburn for three dwellings in place of old sheds and greenhouses (June 2024), and an office-to-crèche change of use at a Dunmurry business park (October 2026).

The adopted Plan Strategy 2032

The council adopted its Local Development Plan 2032 – Plan Strategy on 26 September 2023. The council has confirmed that the operational policies in Part 2 now apply, and that the Planning Policy Statements no longer apply to applications in the district. That matters most in the countryside: a rural house here is not assessed under PPS 21, but under the council’s own countryside policies.

The second document, the Local Policies Plan, will carry the detailed zonings and designations. No draft of it had been published on the council’s plan pages when we checked in November 2026, so older area plan maps (the Lisburn Area Plan 2001; the Lagan Valley Regional Park Local Plan 2005; and, in the former metropolitan Castlereagh area such as Dundonald, the Belfast Urban Area Plan 2001, which is the statutory plan there since BMAP was quashed in 2017, with draft BMAP a material consideration only) can still be relevant for designations. The Plan Strategy also includes two strategic mixed-use sites: SMU01 West Lisburn/Blaris and SMU02 Purdysburn/Knockbracken.

Policies that decide most Lisburn and Castlereagh applications

  • COU1 – Development in the countrysidelists the types of rural development acceptable in principle. If a proposal does not fit one of the routes, it fails at the first hurdle.
  • COU2 – New dwellings in existing clustersa house within an established cluster with a focal point, without visual intrusion into the open countryside.
  • COU3 – Replacement dwellingsreplacing a building that still has the essential characteristics of a dwelling.
  • COU8 – Infill/ribbon developmenta small gap in a substantial, continuously built-up frontage. Getting the “gap” measurement right is crucial.
  • COU10 – Dwellings on farmsactive, established farm business; no sites sold off within 10 years; clustering with farm buildings.
  • COU15 and COU16 – Integration and rural characterthese apply to every countryside proposal and are where many refusals land.
  • HOU policies (HOU1 to HOU12)housing in settlements, density and quality of new residential development.
  • Strategic Policy 18 and the HE policieslisted buildings, conservation areas such as Hillsborough, and archaeology.

Sources: Lisburn & Castlereagh LDP 2032 Plan Strategy and the council’s Sustainability Appraisal policy list, checked 13 November 2026.

How the council handles applications

Applications go in through the NI Planning Portal and are handled by the Planning Unit at Lagan Valley Island. The council publishes weekly lists of delegated applications that have objections or a recommendation to refuse; councillors can ask for those to be brought to the Planning Committee. That list is worth watching if your application has drawn objections.

Lisburn and Castlereagh’s decision times have improved sharply. DfI figures show an average processing time of 48.0 weeks (the official figure is a median) in April to June 2025, falling to 18.3 weeks in the same quarter of 2026.

Landscape and constraints

  • Lagan Valley AONB and Lagan Valley Regional Park along the river between Lisburn and Belfast: extra scrutiny of siting, scale and landscape impact.
  • Urban-edge pressure close to Belfast and on the Castlereagh hills: countryside sites here face firm application of COU15 (integration) and COU16 (rural character).
  • Hillsborough and other historic villages: conservation areas and listed buildings.
  • Flooding near the Lagan and its tributaries: a flood risk assessment may be needed.

What tends to succeed here

Extensions that respect the scale of suburban streets in Lisburn, Carryduff and Dundonald usually go through with little difficulty. Countryside proposals are a different matter: they need a careful COU1 route analysis before anyone buys a site. Commercial changes of use in business parks are often straightforward, provided parking and access are shown to work.

Towns we cover

Lisburn, Hillsborough, Moira, Dromara, Carryduff, Dundonald, Castlereagh, Glenavy, Aghalee, Maghaberry and Dunmurry (the parts in this council).

Frequently asked questions

NI Planning Permission Ltd advises on planning applications in the Lisburn and Castlereagh City Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).

Has Lisburn and Castlereagh adopted a Plan Strategy?

Yes. The council adopted its Plan Strategy on 26 September 2023. If you are thinking about a countryside house, an extension or a change of use here, the planning rules are now those of the council’s own adopted Plan Strategy, not the older regional policy statements as the main framework.

What local issues should I be aware of?

The district covers Lisburn city, the eastern and south-eastern approaches to Belfast, and a wide rural hinterland, including the Lagan Valley. Town, countryside and landscape designations can all affect a proposal, so the site needs to be assessed individually.

Which number should I call?

For a site in this area, call our Lisburn number 028 9235 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form with the site address and a short description of the proposal.

Do you work on countryside sites as well as town extensions?

Yes. We advise homeowners and businesses across the district on countryside houses, extensions and change of use, and we can prepare the application, drawings and supporting statement where that is appropriate.

Does PPS 21 still apply in Lisburn and Castlereagh?

No. Since the Plan Strategy 2032 was adopted on 26 September 2023, countryside proposals are assessed under the council's own policies COU1 to COU16. COU1 sets out the types of development acceptable in principle, and COU15 and COU16 deal with integration and rural character.

What is a farm dwelling assessed against in Lisburn?

Policy COU10 (Dwellings on Farms), read with COU1, COU15 and COU16. Refusals in the district have turned on whether the farm business is active and established and whether sites have been sold off from the holding within 10 years.

For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.

Recent approvals we have secured in Lisburn and Castlereagh

Full · Granted

Change of use: offices to crèche/after-schools

Dunmurry

LA05/2026/0388/F · Decision Oct 2026

Reserved Matters · Granted

Detached dwelling (reserved matters)

Castlereagh hills (Manns Road)

LA05/2023/0711/RM · Decision Apr 2025

Outline · Granted

Three dwellings replacing old sheds and greenhouses (outline)

near Lisburn

LA05/2023/0302/O · Decision Jun 2024

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

See our case studies →

How long decisions take in Lisburn and Castlereagh

In April to June 2026 the council decided 165 local applications and approved 96% of them. The Department's average processing time (a median, from a valid application to a decision) was 18.3 weeks, against 48 weeks in the same quarter of 2025 and 29.4 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.

Local applications: median processing time (weeks), validation to decision or withdrawal
CouncilApr–Jun 2026Apr–Jun 20252025/26 yearWithin 15 weeks (Apr–Jun 2026)
Belfast18.813.618.137.8%
Lisburn and Castlereagh18.34829.445.6%
Antrim and Newtownabbey11.410.41363.6%
Ards and North Down1817.616.345.5%
Newry, Mourne and Down45.846.145.84.3%
Armagh, Banbridge and Craigavon21.820.221.834.9%
Mid Ulster1819.222.442.4%
Mid and East Antrim10.677.662.2%
Causeway Coast and Glens20.82318.233.5%
Derry City and Strabane17.334.525.241.8%
Fermanagh and Omagh8.47.67.669.3%

Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.

Council application fees in Lisburn and Castlereagh

Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:

ApplicationCouncil fee
Householder: extension, alteration, garage, garden building, wall or fence£347 per dwelling
Outline permission: single house£515
Reserved matters: single house£515
Full permission: single house£1,035
Change of use to a dwelling£842 for the first dwelling
Other change of use£307 per 75 m² of floor space
Varying or removing a condition (section 54)£307
Advertisement consent£231
Listed building consent / conservation area consentNo fee

Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Lisburn and Castlereagh

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 9235 0001 ✉ Emailinfo@ Free adviceenquiry form