Ards and North Down at a glance
- Planning authority
- Ards & North Down Borough Council
- Planning office
- Planning Office, 2 Church Street, Newtownards BT23 4AP · 028 9182 4006 · planning@ardsandnorthdown.gov.uk · council planning pages
- Apply / search via
- NI Planning Portal
- Development plan
- Draft Plan Strategy (LDP 2032) published September 2025, not adopted; existing area plans + SPPS + PPSs apply
- Decision times (local)
- Average processing time (a median) 18 weeks in Apr–Jun 2026 (45.5% within 15 weeks); 16.3 weeks over 2025/26. NI target: 15 weeks. Source
- Our local number
- 028 9132 0001 · main office 028 9591 6888
Ards and North Down is a coastal borough: Holywood, Bangor and Donaghadee on Belfast Lough and the Irish Sea, Newtownards and Comber at the head of Strangford Lough, and the long Ards Peninsula down to Portaferry. It is also the council where we have the most recent decisions outside Belfast: 11 on our register summary, from a shop-and-maisonette change of use on Abbey Street in Bangor (October 2026) to glamping pods near Donaghadee, an agricultural store near Greyabbey, a replacement dwelling near Donaghadee and a run of extensions and garage conversions in Comber, Conlig and Newtownards.
Which plan applies in Ards and North Down
The council has not adopted a Plan Strategy. It published its LDP 2032 draft Plan Strategy in September 2025, and re-ran the public consultation from 16 January to 16 March 2026; a counter-representation stage has followed. Until adoption, decisions are made under:
- the Ards and Down Area Plan 2015 (legacy Ards area: Newtownards, Comber, Donaghadee, the Peninsula);
- the North Down and Ards Area Plan 1984–1995 (legacy North Down: Bangor, Holywood), with draft BMAP as a material consideration;
- the Strategic Planning Policy Statement (SPPS) and the Planning Policy Statements.
The draft Plan Strategy is a material consideration, given weight according to its stage. We tell you whether it is likely to matter for your site.
The policies that decide most applications here
- PPS 7 Addendum: Residential Extensions and Alterations (Policy EXT 1)the test for extensions, dormers and garage conversions throughout the borough.
- PPS 7 (QD 1) and the addendum on established residential areas (LC 1)new homes and infill in Bangor, Holywood and the towns.
- PPS 21 – Sustainable Development in the CountrysideCTY 1 (principle), CTY 2a (clusters), CTY 3 (replacement dwellings), CTY 8 (ribbon/infill), CTY 10 (farm dwellings), CTY 13 and CTY 14 (integration and rural character).
- PPS 2 – Natural Heritage, Policy NH 6development in the Strangford and Lecale AONB.
- PPS 6 – Planning, Archaeology and the Built Heritagelisted buildings and conservation areas (for example in Holywood, Donaghadee and Portaferry).
- PPS 16 – Tourismglamping, holiday accommodation and visitor facilities in the countryside.
- PPS 15 – Planning and Flood Riskcoastal and fluvial flooding along the lough shores.
- PPS 17 – Control of Outdoor Advertisementsshop signs and advertisement consent.
Sources: Ards and North Down planning and council LDP pages, checked November 2026.
How the council handles applications
The Planning Office is at 2 Church Street, Newtownards (028 9182 4006). Applications are submitted through the NI Planning Portal. DfI’s statistics put the average processing time at 18.0 weeks (the official figure is a median) in April to June 2026 (16.3 weeks across 2025/26). Coastal and lough-shore sites often need consultation with the NI Environment Agency, which adds time, so a complete ecology and drainage picture up front helps.
Landscape and constraints
- Strangford and Lecale AONB across much of the Peninsula and the lough shore.
- Strangford Lough: international nature conservation designations; ecology and drainage must be addressed.
- Coastal exposure on the outer Peninsula: siting and integration (CTY 13) are often decisive.
- Conservation areas in historic town and village centres.
What tends to succeed
Garage conversions, single-storey rear extensions and modest garden buildings are usually approved under EXT 1. Small tourism schemes can work under PPS 16 where they are well screened and tied to the landscape. In the countryside, sites that genuinely fill a small gap in a built-up frontage, or replace a building that is clearly a dwelling, are the realistic routes.
Towns we cover
Bangor, Newtownards, Holywood, Comber, Donaghadee, Ballywalter, Kircubbin, Portaferry, Greyabbey and Cloughey.
Frequently asked questions
NI Planning Permission Ltd advises on planning applications in the Ards and North Down Borough Council area. Our planning team is led by a Full Corporate Member of the Irish Planning Institute (MIPI).
Has Ards and North Down adopted a Local Development Plan Strategy?
Not yet. A new Local Development Plan is on the way, but it has not been adopted. Most applications are still assessed against the existing development plans and the regional Planning Policy Statements, including PPS 21 for development in the countryside. The emerging plan may be a material consideration, but it does not yet replace those documents.
What local issues come up in this borough?
Ards and North Down is a coastal borough, from Holywood and Bangor around to Newtownards, Donaghadee, the Ards Peninsula and Strangford Lough. Coastal exposure, lough-shore landscape and heritage designations often affect siting, design and whether a rural house or an extension is likely to be realistic.
Which number should I call?
For a site in this area, call our Bangor and Newtownards number 028 9132 0001, or the main line 028 9591 6888. Email info@niplanningpermission.co.uk or use our contact form, and include the site address and a short description of the proposal.
Which plan covers Bangor and Holywood?
For the legacy North Down area the statutory plan is the North Down and Ards Area Plan 1984–1995, with the draft Belfast Metropolitan Area Plan as a material consideration after the 2017 judgment. The legacy Ards area is covered by the Ards and Down Area Plan 2015.
Does the draft Plan Strategy change anything yet?
It is a material consideration, but until adopted it does not replace the existing plans or the Planning Policy Statements. Its proposed designations, such as an undeveloped coastal zone, only take effect if and when the plan is adopted.
For advice on your own proposal, contact us or call 028 9591 6888. NI Planning Permission Ltd, registered in Northern Ireland, company number NI648144.
Recent approvals we have secured in Ards and North Down
Full · Granted
Change of use: takeaway to shop and maisonette (renewal)
Bangor
LA06/2026/0571/F · Decision Oct 2026
Full · Granted
Domestic garage and curtilage extension
near Comber
LA06/2025/0782/F · Decision Apr 2026
Full · Granted
Agricultural storage shed
near Greyabbey
LA06/2022/0997/F · Decision Apr 2026
Full · Granted
Single-storey rear extension
near Comber
LA06/2024/0819/F · Decision Nov 2024
Outline · Granted
Replacement dwelling and garage (outline)
near Donaghadee
LA06/2023/1668/O · Decision Oct 2024
Full · Granted
Garage conversion to kitchen
Conlig
LA06/2024/0635/F · Decision Aug 2024
Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.
How long decisions take in Ards and North Down
In April to June 2026 the council decided 195 local applications and approved 96% of them. The Department's average processing time (a median, from a valid application to a decision) was 18 weeks, against 17.6 weeks in the same quarter of 2025 and 16.3 weeks across the whole of 2025/26. The Northern Ireland average was 20.0 weeks.
| Council | Apr–Jun 2026 | Apr–Jun 2025 | 2025/26 year | Within 15 weeks (Apr–Jun 2026) |
|---|---|---|---|---|
| Belfast | 18.8 | 13.6 | 18.1 | 37.8% |
| Lisburn and Castlereagh | 18.3 | 48 | 29.4 | 45.6% |
| Antrim and Newtownabbey | 11.4 | 10.4 | 13 | 63.6% |
| Ards and North Down | 18 | 17.6 | 16.3 | 45.5% |
| Newry, Mourne and Down | 45.8 | 46.1 | 45.8 | 4.3% |
| Armagh, Banbridge and Craigavon | 21.8 | 20.2 | 21.8 | 34.9% |
| Mid Ulster | 18 | 19.2 | 22.4 | 42.4% |
| Mid and East Antrim | 10.6 | 7 | 7.6 | 62.2% |
| Causeway Coast and Glens | 20.8 | 23 | 18.2 | 33.5% |
| Derry City and Strabane | 17.3 | 34.5 | 25.2 | 41.8% |
| Fermanagh and Omagh | 8.4 | 7.6 | 7.6 | 69.3% |
Source: Department for Infrastructure, Northern Ireland Planning Statistics, April–June 2026, Table 4.2 (provisional, accredited official statistics). Statutory target: 15 weeks. All councils: 20.0 weeks.
Council application fees in Ards and North Down
Planning fees are set by the Department for Infrastructure and are the same in every NI council. The current figures (in force since 1 April 2025) include:
| Application | Council fee |
|---|---|
| Householder: extension, alteration, garage, garden building, wall or fence | £347 per dwelling |
| Outline permission: single house | £515 |
| Reserved matters: single house | £515 |
| Full permission: single house | £1,035 |
| Change of use to a dwelling | £842 for the first dwelling |
| Other change of use | £307 per 75 m² of floor space |
| Varying or removing a condition (section 54) | £307 |
| Advertisement consent | £231 |
| Listed building consent / conservation area consent | No fee |
Source: Planning (Fees) (Amendment) Regulations (NI) 2025; DfI planning fees. Certificate of lawfulness fees depend on the type of certificate. Always confirm with the Portal fee calculator before submitting. Our own professional fee is separate from the council fee.
How to work with us
- Call or email
Send the site address (or postcode) and a line about what you want to do.
- Free initial view
We check the plan, constraints and planning history and tell you honestly what is realistic.
- Site appraisal
Where needed, a site appraisal to confirm the policy route and the reports your application will need.
- Drawings & application
We prepare the drawings, statements and forms and submit through the Planning Portal.
- Through to decision
We deal with the case officer and consultees and keep you updated until the decision.
Planning advice in Ards and North Down
Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.