NI Planning Permission Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 3045 0001 info@niplanningpermission.co.uk

Planning Permission in Newry

Planning help in Newry city and south Armagh: rural homes under PPS 21, infill sites, conversions and city-centre changes of use, in a council with some of the longest decision times in Northern Ireland.

Newry sits at the meeting point of south Armagh, south Down and the border. A large share of our work in the Newry area is rural: the townlands around Jonesborough, Mullaghbawn, Silverbridge and Newtownhamilton, where the register records our approvals for infill dwellings, a family annex, an off-site replacement and a pub converted to a dwelling. In the city we advise on extensions, flats over shops and changes of use along Hill Street, Margaret Street and the canal quays.

The plan that applies

Newry, Mourne and Down published a draft Plan Strategy on 27 June 2025 and was consulting on focused changes from 26 October to 21 December 2026, but the Plan Strategy is not adopted. Newry and south Armagh are covered by the Banbridge, Newry and Mourne Area Plan 2015, with the SPPS and the Planning Policy Statements. In the countryside, PPS 21 decides whether a new house is acceptable in principle.

Types of planning application around Newry

  • Outline permission (single dwelling £515)usually the first step on a rural site; it settles the principle under PPS 21 before design costs are incurred.
  • Reserved matters (£515)approval of the access, appearance, landscaping, layout and scale left over from the outline, as at our Mullaghbawn infill approval.
  • Full permission (£1,035 for one house)where the design is ready, such as our Jonesborough annex.
  • Change of useour Silverbridge case converted a public house/restaurant to a dwelling (£842 for change of use to one dwelling).
  • Householder applicationextensions, sunrooms and garages in Newry’s estates; tested under PPS 7 Addendum Policy EXT 1.
  • Listed building and conservation area consentsthe city’s Georgian and Victorian streets and churches. Assessed under PPS 6.
  • Certificate of lawfulness of existing use or developmentconfirming existing uses, or that older buildings are immune from enforcement.
  • Advertisement consentsignage in the city centre and retail parks, under PPS 17.

Policy that decides rural sites here

  • CTY 8 (infill): a small gap, sufficient only for up to two houses, in a substantial and continuously built-up frontage. Jonesborough and Mullaghbawn approvals were both infill cases.
  • CTY 3 (replacement): the building must have the essential characteristics of a dwelling. Off-site replacement needs justification, as at Newtownhamilton.
  • CTY 10 (farm dwellings): active and established farm business, clustering with buildings on the farm.
  • NH 6 (AONB): the Ring of Gullion AONB covers much of south Armagh; the Mourne AONB begins east of the city.

Our advice for Newry clients

Given the decision times, we prepare the drawings, site layout, access visibility splays and supporting statement so that the case officer has nothing to ask for. Where a site is marginal, we tell you before you spend money.

Frequently asked questions

Which area plan covers Newry?

The Banbridge, Newry and Mourne Area Plan 2015, together with the SPPS and the Planning Policy Statements, until Newry, Mourne and Down adopts its Plan Strategy. The draft Plan Strategy, published in June 2025, is a material consideration.

How long will a Newry application take?

DfI statistics give an average processing time of 45.8 weeks (the official figure is a median) for local applications in Newry, Mourne and Down in April to June 2026. Plan on many months, and get the first submission right.

We confirm the current policy position for your site before you apply.

How the main application types work in Northern Ireland

Outline permission and reserved matters
Outline permission settles the principle. Reserved matters are the access, appearance, landscaping, layout and scale left for later approval. Fee £515 each for a single dwelling, or £1,035 for a full application for one dwelling.
"Householder" applications
Not a separate consent. It is a full application for works to an existing house, made on the NI Planning Portal's householder form, with a fee of £347 per dwelling.
Change of use
A material change of use needs permission. £842 for a change of use to a dwelling; £307 per 75 m² for other changes of use. An HMO is a sui generis use and needs planning permission as well as a licence under the Houses in Multiple Occupation Act (NI) 2016.
Certificates of lawfulness
Certificate of lawfulness of existing use or development (section 169) or of proposed use or development (section 170). Northern Ireland has a single five-year immunity period (section 132), proved with evidence.
Listed building consent and conservation area consent
Separate from planning permission and free to apply for. Conservation area consent still applies in Northern Ireland to demolition in a conservation area.
Advertisement consent
Express consent for signage, fee £231.

Fees from the Planning (Fees) (Amendment) Regulations (Northern Ireland) 2025, in force since 1 April 2025. Confirm the fee on the DfI planning fees page before you submit.

Approvals we have secured near Newry

Full · Granted

Change of use: pub/restaurant to a dwelling

Silverbridge

LA07/2024/0920/F · Decision Aug 2025

Outline · Granted

Infill dwelling (outline)

Jonesborough

LA07/2023/1325/O · Decision Aug 2025

Outline · Granted

Off-site replacement dwelling (outline)

near Newtownhamilton

LA07/2023/2906/O · Decision Jan 2025

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

Decision times, fees and the planning office for this area are on our Newry, Mourne and Down council guide. Average processing time for local applications in Apr–Jun 2026 (a median): 45.8 weeks (DfI Planning Statistics).

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Newry

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 3045 0001 ✉ Emailinfo@ Free adviceenquiry form