Do I Qualify for a Farm Dwelling in Northern Ireland?

By the NI Planning Permission team · November 19, 2026

If you own or work an active farm in Northern Ireland, you may be able to get planning permission for a new house on the farm, even where countryside housing is otherwise tightly controlled. Under Policy CTY 10 of PPS 21, a farm dwelling can be acceptable where the farm business is currently active and has been established for at least six years, no dwellings or development opportunities have been sold off from the holding in the last ten years, and the new house is sited with an established group of buildings on the farm. In a council that has adopted its own Plan Strategy, the equivalent local policy applies instead.

This guide explains each test, the evidence councils usually ask for, and the points that most often cause problems. It is general information, not advice on a particular site.

First, check which policy applies to your farm

PPS 21 (Sustainable Development in the Countryside) is still the operational policy for countryside housing in councils that have not yet adopted a Plan Strategy. At the time of writing (November 2026), six councils have adopted a Plan Strategy: Belfast, Fermanagh and Omagh, Lisburn and Castlereagh, Mid and East Antrim, Antrim and Newtownabbey, and Derry City and Strabane. In those districts, PPS 21 has ceased to have effect and the council’s own farm dwelling policy is the test.

The local policies cover similar ground, but the wording and detail are not always identical, so never assume that “CTY 10” is the policy for your site. Our article on whether PPS 21 still applies explains how to tell. The tests below are those in PPS 21.

The three CTY 10 tests

1. An active and established farm business

The farm business must be currently active and must have been established for at least six years. The policy says the applicant will be asked for the farm’s business ID number, along with other evidence of active farming over that period. The business ID is now issued by the Department of Agriculture, Environment and Rural Affairs (DAERA).

PPS 21 defines agricultural activity as the production, rearing or growing of agricultural products, including harvesting, milking, breeding animals and keeping animals for farming purposes, or maintaining the land in good agricultural and environmental condition. Evidence commonly includes:

  • the DAERA business ID and the date it was allocated;
  • single application or subsidy records for each year;
  • invoices and receipts for farm inputs, contracting and sales;
  • herd or flock records; and
  • conacre or lease agreements, where land is let in or let out.

A business ID on its own may not be enough if there is little to show that farming has actually taken place on the land. Gaps in the record are one of the commonest reasons a farm dwelling application runs into difficulty.

2. Nothing sold off in the last ten years

No dwellings or development opportunities outside settlement limits can have been sold off from the farm holding within ten years of the date of the application. This provision applies from 25 November 2008.

“Sold off” is wider than many people expect. PPS 21 says it means any development opportunity disposed of from the farm holding to any other person, including a member of the family. That can include a site with planning permission, a replacement opportunity or a building capable of conversion. The policy also says permission will not be granted where a rural business is artificially divided solely to obtain planning permission.

If a site or house has left the holding in recent years, check the dates carefully before going further.

3. Siting with the farm buildings

The new house must be visually linked or sited to cluster with an established group of buildings on the farm. Where practicable, access should come from an existing lane. The idea is that, from surrounding viewpoints, the new house reads as part of the farm group rather than a separate house in an open field. A house sited beside buildings on a neighbouring farm will not satisfy this test.

Exceptionally, an alternative site elsewhere on the farm may be considered, but only where there are no other sites available at another group of buildings on the farm or an out-farm, and there are either demonstrable health and safety reasons or verifiable plans to expand the farm business at the existing building group. In those cases the site must also meet the integration and rural character tests in CTY 13, CTY 14 and CTY 16. PPS 21 indicates that independent evidence, for example from the Health and Safety Executive or the council’s environmental health department, will be expected.

The once-every-ten-years limit

Planning permission under CTY 10 will only be forthcoming once every ten years. That is a limit on how often the policy can be used for the holding. It is not an entitlement to a new house every decade. Each application still has to meet all of the tests at the time it is made.

Equine businesses

PPS 21 treats a commercial equine business, such as breeding, training, a livery yard or a riding school, in the same way as an active and established farm. It must show a level of involvement consistent with commercial activity over the six-year period, for example rating history, insurance and horse passports. Keeping horses as a hobby does not qualify.

Design, integration and access still matter

Meeting the farm business tests only establishes the principle. The house must also:

  • integrate into the landscape and avoid being a prominent feature (CTY 13);
  • avoid harming rural character or adding to a ribbon of development (CTY 14);
  • have a safe access, with visibility splays that meet Department for Infrastructure guidance; and
  • have an acceptable means of sewage disposal where there is no mains connection (CTY 16).

Building on Tradition, the Department’s countryside design guide, remains a useful reference for siting, scale and form.

Outline or full application?

Many farm dwelling applications are made in outline first, to establish the principle and the site before detailed design. If outline permission is granted, the reserved matters must usually be applied for within three years. See our guide to what outline planning permission means in Northern Ireland for the timetable.

How we can help

Our team looks at the farm records, the planning history of the holding, any land or sites that have left it, and the farm building groups before recommending a site. Where the evidence is thin, we will say so early, before you spend money on drawings. Read more on our farm dwellings service page, our wider guide to planning permission for a house in the countryside, and our site appraisals service.

Frequently asked questions

Do I have to be a full-time farmer to get a farm dwelling?

No. CTY 10 looks at whether the farm business is active and established, not whether the applicant farms full time. PPS 21 recognises that new dwellings on farms can house both people engaged in the farm business and other rural dwellers. The evidence of farming activity over six years is what matters.

Can I get a farm dwelling if I let my land in conacre?

It depends on the facts and on which policy applies. The question is whether the farm business itself is currently active and established. Land let in conacre can make that harder to show, and the evidence needs careful review.

Can my son or daughter build on the farm?

A farm dwelling can be occupied by a family member, but the site must still meet every test. Transferring a site to a family member can count as a sold-off development opportunity for future applications on the same holding.

What if I sold a site off the farm eight years ago?

Under CTY 10, a sale of a dwelling or development opportunity from the holding within ten years of the application date, and after 25 November 2008, is likely to prevent permission until that period has passed. Check the dates against the council’s current policy.

Does the farm dwelling have to be beside the farmyard?

Normally it must be visually linked or sited to cluster with an established group of buildings on the farm. An alternative site is only considered exceptionally, with evidence of health and safety reasons or verifiable expansion plans.

Talk to us about your farm

If you are thinking about a house on your farm anywhere in Northern Ireland, call our team on 028 9591 6888 or send us the details through our contact page. We will look at whether a realistic policy route exists before you commit to detailed plans.

Get planning advice

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 9591 6888 ✉ Emailinfo@ Free adviceenquiry form