NI Planning Permission Scottish Provident Building, 7 Donegall Square West, Belfast BT1 6JH 028 9132 0001 info@niplanningpermission.co.uk

Planning Permission in Newtownards

Newtownards, Comber and the Ards Peninsula. The Ards and Down Area Plan 2015 and PPS 21 govern rural houses, farm buildings and coastal sites, with the Strangford and Lecale AONB across much of the Peninsula.

Newtownards is the borough’s administrative centre, under Scrabo Tower at the head of Strangford Lough. The planning office is on Church Street. From there the Ards Peninsula runs south through Greyabbey, Kircubbin and Portaferry, and Comber sits to the west. Our recent approvals here include a domestic garage and curtilage extension near Comber (2026), an agricultural storage shed near Greyabbey (2026), a single-storey rear extension near Comber (2024), a garage extension with storage above in Newtownards (2023) and a replacement dormer in Cloughey (2023).

The plan that applies

The Ards and Down Area Plan 2015, the SPPS and the Planning Policy Statements apply. The borough’s draft Plan Strategy (LDP 2032) is not adopted. Countryside proposals are therefore tested under PPS 21, and AONB sites under PPS 2 NH 6.

Types of planning permission around Newtownards

  • Replacement dwelling (CTY 3)outline or full; we secured outline for a replacement dwelling and garage near Donaghadee in 2024.
  • Infill dwelling (CTY 8)frontage sites on the Peninsula roads.
  • Agricultural buildingssheds and stores; PPS 21 CTY 12.
  • Curtilage extensionextending a garden into adjoining land, often with a garage or shed.
  • Householder application (EXT 1)extensions, garages, dormers.
  • Tourism (PPS 16)glamping pods, holiday cottages, visitor facilities.
  • Conservation area consentPortaferry, Greyabbey and Kircubbin.
  • Certificate of lawfulness of existing use or development.

Peninsula constraints

  • Strangford and Lecale AONB: integration (CTY 13) and design are decisive.
  • Strangford Lough: international nature conservation designations; drainage and ecology.
  • Coastal flood risk around the Lough shore and Ards coast.

Next step

Call 028 9132 0001. We look at the site’s visibility from roads and the Lough before advising on siting.

Frequently asked questions

Where is the Ards and North Down planning office?

2 Church Street, Newtownards BT23 4AP (028 9182 4006, planning@ardsandnorthdown.gov.uk). Applications are submitted online through the NI Planning Portal.

Can I get planning for glamping on the Peninsula?

Possibly, under PPS 16 (Tourism) and PPS 21. Location, landscape integration and access are key. We secured reserved matters for five glamping pods and a communal building near Donaghadee in 2024.

We confirm the current policy position for your site before you apply.

How the main application types work in Northern Ireland

Outline permission and reserved matters
Outline permission settles the principle. Reserved matters are the access, appearance, landscaping, layout and scale left for later approval. Fee £515 each for a single dwelling, or £1,035 for a full application for one dwelling.
"Householder" applications
Not a separate consent. It is a full application for works to an existing house, made on the NI Planning Portal's householder form, with a fee of £347 per dwelling.
Change of use
A material change of use needs permission. £842 for a change of use to a dwelling; £307 per 75 m² for other changes of use. An HMO is a sui generis use and needs planning permission as well as a licence under the Houses in Multiple Occupation Act (NI) 2016.
Certificates of lawfulness
Certificate of lawfulness of existing use or development (section 169) or of proposed use or development (section 170). Northern Ireland has a single five-year immunity period (section 132), proved with evidence.
Listed building consent and conservation area consent
Separate from planning permission and free to apply for. Conservation area consent still applies in Northern Ireland to demolition in a conservation area.
Advertisement consent
Express consent for signage, fee £231.

Fees from the Planning (Fees) (Amendment) Regulations (Northern Ireland) 2025, in force since 1 April 2025. Confirm the fee on the DfI planning fees page before you submit.

Approvals we have secured near Newtownards

Full · Granted

Domestic garage and curtilage extension

near Comber

LA06/2025/0782/F · Decision Apr 2026

Full · Granted

Agricultural storage shed

near Greyabbey

LA06/2022/0997/F · Decision Apr 2026

Full · Granted

Single-storey rear extension

near Comber

LA06/2024/0819/F · Decision Nov 2024

Decisions from the public NI Planning Register (Mid Ulster: the council's own portal), where NI Planning Permission Ltd is recorded as agent. Locations are shown by village or area only.

Decision times, fees and the planning office for this area are on our Ards and North Down council guide. Average processing time for local applications in Apr–Jun 2026 (a median): 18 weeks (DfI Planning Statistics).

How to work with us

  1. Call or email

    Send the site address (or postcode) and a line about what you want to do.

  2. Free initial view

    We check the plan, constraints and planning history and tell you honestly what is realistic.

  3. Site appraisal

    Where needed, a site appraisal to confirm the policy route and the reports your application will need.

  4. Drawings & application

    We prepare the drawings, statements and forms and submit through the Planning Portal.

  5. Through to decision

    We deal with the case officer and consultees and keep you updated until the decision.

Planning advice in Newtownards

Send the site address and a line about your plans. A member of our planning team will reply, usually the same working day.

Thinking about a planning application?

Send us the address. We will tell you honestly whether it is likely to work, and what it would take.

☎ Call Now028 9132 0001 ✉ Emailinfo@ Free adviceenquiry form